Installation Guide
RUSTICAHARDWARE.com
8
3
03
2017
VERSION
MOUNTAIN MODERN Installation Instructions
Figure 6
Figure 7
Figure 8
7. Drill pilot holes for the stud installation in
the header with an 1/8” drill bit (Figure 6).
8. Align the line on the wall with the line made
on the header in step 4. Ensure pilot holes
align with wall studs (Figure 7).
9. Install header using 3” wood screws (F.)
(Figure 7).
10. Header installation is complete (Figure 8).
Proceed with track installation on pages 4 and
5.










