Installation Guide
Two Panel Door
2.
Slide Center Rail A3 down on top of the B Slats and into
Side Stile A1 R. Gently tap with a rubber mallet.
Slide all C Slats down and to the right into Center
Rail A3 and Side Stile A1 R. en slide top rail A4
down over the tops of the C Slats. Gently tap with
a rubber mallet.
3.
Slide Side Stile A1 L over to cover the left edge of
your Door. If necessary, have someone help you hold
all slats and rails in place while you are positioning all
parts. Lightly tap all into place with a rubber mallet.
4.
B2
B2
C1
B2 B2 B2 B3
A1
L
A3
B1 B2
A4
A1
R
C2
C2
C2
C2
C2
C2
C3
A2
B2 B2
C1
B2B2B2 B3
A1
L
A3
B1
B2
A4
A1
R
C2
C2 C2
C2
C2 C2 C3
A2
5.
Attach Stile A1 L and A1 R to the door using the
6” Lag Bolts. Insert and tighten by hand, then use a
ratchet to tighten all Lag Bolts.
A1
L
7
/16”
7
/16”
7
/16”
7
/16”
A1
L










