Installation Guide

R H
•••••••••••••••••••••••••••••••••••••••••
INSTALLATION INSTRUCTIONS
HANGING TRACK
1. Marking and Drilling Track Holes
Hold up your Track so that
the marked line from the
previous step is visible
through the Track holes.
Mark an intersecting line in
the center point of each of
the Track holes.
Set the Track down.
Using a drill with 1/4” drill
bit, drill out your marked
Track holes.*
*Be sure you are drilling into
wall studs. If your track holes
are not lining up with your
studs, you will need to install
your Track onto a header. The
header needs be attached to
your wall through the studs.
This will provide the stability
your wall needs to hold the
weight of your Door.
1/4”
2. Hanging Your Track
• e outside holes will be
installed with a either a Track
Stop or a Lag Soft Stop.
In this order: Adjustable Spacer,
Flat Track, [Track or Lag Soft]
Stop, 1” Washer, and Lag Screw.
Using a ratchet with a 9/16”
socket, tighten the Lag Screw
most of the way, enough to hold
the Track in place, but allowing
the Track to move.
Swing the Track up to be
horizontal, and repeat the same
step on the opposite end of the
Track.
e hardware for the middle holes will
be installed in this order: Adjustable
Spacer, Flat Track, 1” Washer, and Lag
Screw. Using a ratchet with a 9/16” socket,
tighten the Lag Screw most of the way.
Repeat on all remaining middle Track
holes.
After all Lag Screws are in, fully tighten
all using your ratchet with socket, being
careful not to over-tighten to avoid
stripping the wall studs.
9/16”
Track Stop or Lag Soft Stop
Loosely attach one end of the Track
using a Track Stop or a Lag Stop
(see below).
Swing the Track up and loosely
attach the other end, using a Track
Stop or a Lag Stop (see below).
e center holes can now be loosely
attached (see below).
9/16”
3. Hole Installation