Installation Guide

Page 8
4.
Slide all C Slats into A1 R and A3 grooves. Once
all of the slats have been positioned, place the A4
Top Rail onto the C slats and in the A1 R grooves.
Fasten A4 into place with a Timberlock, ๎€Ÿrst with
your hand, then tighten with a ratchet. Be sure
the Timberlock is going straight in and not at an
angle. Fasten by hand, then with a ratchet.
Slide Side Slat A1 L into place, attaching with 6โ€
Timberlocks, tightening by hand. Once you have
determined all are in place straight, tighten
Timberlocks with a ratchet.
5.
When the Door is
assembled, place
A5, A6 and A7 (Top
Diagonal Rails)
onto the door so
the predrilled holes
are facing up and so
they form an X that
runs from corner to
corner. Attach using
the 1-1/4โ€ Grabber
Screws and a drill
with a Phillips bit.
Repeat for B5, B6,
and B7 (Lower
Diagonal Rails).
Attach the Door Pull
and your Door is
ready to hang.
6.
A1
L
C1
C2 C2
A4
A1
L
B6
B5
B7
A6
A5
A7
A5
A6
B6
B5
B7
A7
Double X Door