Installation Guide
Page 6
4.
Slide all C Slats into A1 R and A3 grooves. Once 
all of the slats have been positioned, place the A4 
Top Rail onto the C slats and in the A1 R grooves. 
Fasten A4 into place with a Timberlock, ๎rst with 
your hand, then tighten with a ratchet. Be sure 
the Timberlock is going straight in and not at an 
angle. 
Slide Side Slat A1 L into place, attaching with 6โ 
Timberlocks, tightening by hand. Once you have de-
termined all are in place straight, tighten Timberlocks 
with a ratchet.
5.
When the Door is 
assembled, place A5, 
A6 and A7 (Diagonal 
Rails) onto the door 
so the predrilled holes 
are facing up and so 
they form an X that 
runs from corner to 
corner. Attach using 
the 1-1/4โ Grabber 
Screws and a drill with 
a Phillips bit. 
Attach the Door Pull 
and your Door is 
ready to hang.
6.
A1
L
C1
A1
L
C2
C2
C2 C2
C2
C2
C3
A3
A4
Half X Door
Z Combination Door










