Installation Guide

Page 6
4.
Slide all C Slats into A1 R and A3 grooves. Once
all of the slats have been positioned, place the A4
Top Rail onto the C slats and in the A1 R grooves.
Fasten A4 into place with a Timberlock, ๎€Ÿrst with
your hand, then tighten with a ratchet. Be sure
the Timberlock is going straight in and not at an
angle.
Slide Side Slat A1 L into place, attaching with 6โ€
Timberlocks, tightening by hand. Once you have de-
termined all are in place straight, tighten Timberlocks
with a ratchet.
5.
When the Door is
assembled, place A5,
A6 and A7 (Diagonal
Rails) onto the door
so the predrilled holes
are facing up and so
they form an X that
runs from corner to
corner. Attach using
the 1-1/4โ€ Grabber
Screws and a drill with
a Phillips bit.
Attach the Door Pull
and your Door is
ready to hang.
6.
A1
L
C1
A1
L
C2
C2
C2 C2
C2
C2
C3
A3
A4
Half X Door
Z Combination Door