Installation Guide
Two Panel Door
2.
Slide Center Rail A3 down on top of the B Slats and
into Slat A1 R. If necessary, have someone help keep the
door square as you attach with the Timberlocks. Have all
Timberlocks go in straight, using your hands rst, then
a ratchet.
Slide all C Slats down and to the right into
Center Rail A3 and Side Slat A1 R.
en slide top rail A4 down over
the tops of the C Slats.
3.
Slide Side Slat A1 L over to cover the left edge of
your Door. Insert the Timberlocks by hand, then use
a ratchet to fully tighten. If necessary, have someone
help you hold all slats and rails in place while you are
positioning and fastening A1 L.
4.
B2 B2
C1
B2B2 B2B3
A1
L
A3
B1 B2
D1
D1
D1
D1
A4
A1
R
C2
C2
C2
C2
C2
C2
C3
A2
B2 B2
C1
B2B2 B2B3
A1
L
A3
B1
B2
D1
D1
D1
A4
A1
R
C2
C2 C2
C2
C2 C2
C3
A2
D1
D1
D1
D1
5.
Attach Slat A1 L to the door using the 6” Timber-
locks. Insert by hand, then use a ratchet to tighten.
A1
L
Page 5