Installation Guide
1. Marking and Drilling Track Holes
•  Hold up your Track so that 
  the marked line from the 
  previous step is visible 
  through the Track holes.
•  Mark an intersecting line in 
  the center point of each of 
  the Track holes.
•  Set the Track down.
•  Using a drill with 1/4” drill 
  bit, drill out your marked 
  Track holes.*
*Be sure you are drilling into 
wall studs. If your track holes 
are not lining up with your 
studs, you will need to install 
your Track onto a header. The 
header needs be attached to 
your wall through the studs. 
This will provide the stability 
your wall needs to hold the 
weight of your Door.
1/4”
2. Hanging Your Track
• e end holes will be
  installed with a either a Hard 
 Stop or a Lag Soft Stop.
•  In this order: Adjustable Spacer,
  Flat Track, [Hard or Lag Soft] 
  Stop, 1” Washer, and Lag Screw. 
  Using a ratchet with a 9/16”
  socket, tighten the Lag Screw 
  most of the way, enough to hold
  the Track in place, but allowing
  the Track to move.
•  Swing the Track up to be 
  horizontal, and repeat the same
  step on the opposite end of the 
 Track.
•  e hardware for the middle holes will 
  be installed in this order: Adjustable 
  Spacer, Flat Track, 1” Washer, and Lag 
  Screw. Using a ratchet with a 9/16” socket,
  tighten the Lag Screw most of the way.
•  Repeat on all remaining middle Track
 holes. 
•  After all Lag Screws are in, fully tighten
  all using your ratchet with socket, being 
  careful not to over-tighten to avoid
  stripping the wall studs.
9/16”
Hard Stop or Lag Soft Stop
•  Loosely attach one end of the Track
  using a Spacer and a Hard Stop or a 
  Lag Soft Stop (see below).
•  Swing the Track up and loosely 
  attach the other end, using a Spacer 
  and a Hard Stop or a Lag Soft
  Stop (see below).
•  e center holes can now be loosely 
  attached (see below).
9/16”
3. Hole Installation
Installing the Track
Page 12










