Installation Guide
Installing the Industrial Hangers
2
"
• Lay your Door
facing UP on saw horses.
• Pencil a line 2” parallel
from the Door edge (this
marks the proper location
for the Hanger edge).
• Using your Hanger as a guide, line
up your Hanger with the line you just made.
• Holding your Hanger in place, measure a
2-3/8
”
gap between the top of the Door and the
bottom of the Wheel (see below).
• Mark the center of both Hanger holes (these indicate
where you should drill to attach your Hanger to your Door).
• Repeat Step 1 on the opposite Door edge.
1. Measuring and Marking Your Hanger Holes
• Using a drill with a 1/8”
bit, drill a pilot hole all
the way through the Door
where you have marked.
(one pilot hole for each
hole in the Hanger).
• Repeat Step 2 on the opposite
edge of the Door.
Door Edge
Door Front
Door Top
• Lay the Door facing DOWN on the saw horses.
• Using a drill with a 1-1/8” spade bit or Forstner bit
(a Forstner bit is preferred), drill a 7/16” deep hole,
centering your 1-1/8” spade or Forstner bit directly
over the 1/8” pilot hole.
• Repeat Step 3 on the opposite edge of the Door.
2. Drilling Pilot Holes
3. Drilling Countersink Holes 4. Drilling Lag Screw Holes
• Lay the Door facing UPWARDS on the saw horses.
• Using a drill with a 3/8” drill bit, drill all the way
through the Door, through your pilot holes (Step 2).
• Repeat Step 4 on the opposite edge of the Door.
1/8”
1-1/8”
3/8”
Door Edge
Door Front
Door Top
Door Edge
Door Back
Door Top
Door Front
Door Top
Door Edge
Door Top
2-3/8”
1/8”
Page 10