User Guide

TECHNICAL DATA
RSD-10
ROCKSOLID
®
GARAGE FLOOR COATING KIT
2
PRODUCT APPLICATION (cont.)
MIXING (cont.)
Combine the two components by placing the pouch on the
ground and rolling it from the part A side towards the part B
side like a tube of toothpaste. This will create pressure in the
part A side and force the middle seal to burst, allowing the
two components to mix together. Thoroughly mix the
materials by shaking the pouch back and forth and
squeezing the edges and corners toward the center of the
pouch. Mix for 2-3 minutes.
APPLICATION
Apply only when air, material and floor temperatures are
between 40-90°F (4-32°C). Optimal installation temperature
is 55-90°F (13-32°C). Extreme cold application temperatures
may slow the cure time. Do not apply in direct sunlight.
Do not coat the floor if it is raining or if extremely damp
conditions exist. The concrete surface must be completely
dry at the time of the application to achieve proper adhesion.
Once the material in thoroughly mixed, use a scissors to cut
a corner off the pouch. Pour the contents of the pouch
directly onto the floor in a 2-3” wide ribbon about 4’ long.
Trim the edges from the poured ribbon of material using a
good quality synthetic brush. Use the supplied RockSolid
⅜” Microfiber Roller Cover on a 9” roller frame to apply the
coating evenly to the floor in 4’ x 4’ sections in an “M” and
“W” pattern. Continue working in 4’ x 4’ sections, pouring a
new ribbon 2’ away from the previous section. Use the roller
to pull the material back first; then push forward to fill in the
void between sections. Overlap into the previously coated
areas while taking care to avoid creating thick spots.
Once a strip across the entire back wall has been coated,
toss the decorative paint chips onto the wet coating. Leave a
6”-12” section of wet film without decorative chips. This
section will be rolled into when coating the next 4’ x 4’ area.
Skip this step if paint chips are not desired. The coating
performance will not be affected.
Do not coat or roll over control joints. Use a flexible control
joint fill material if desired. Repeat the above steps for each
additional pouch.
COVERAGE RATE
Each Polycuramine pouch covers up to 200-250 square feet.
Coverage may vary based on condition and porosity of the
concrete.
DRY TIME
Temperature and humidity may affect drying time. Do not
walk on the coating while it is still tacky. Surface should be
ready for foot traffic in 8-10 hours and vehicle traffic in 24-36
hours depending upon temperature and humidity.
PRODUCT APPLICATION (cont.)
CLEAN-UP
Clean tools and equipment with mineral spirits. Allow
unused product to harden in container and dispose
according to local regulations.
LIMITATIONS
This product must be installed at the specified spread rates
to perform as described. Do not apply in direct sunlight. Do
not apply product when the substrate and ambient
temperatures are steadily below 40°F (4°C).
SHELF LIFE and STORAGE
Sixty (60) months in factory delivered unopened pouches.
Keep away from extreme heat, cold and moisture. Maintain
at a proper storage temperature of 45-90°F. Keep out of
direct sunlight and away from fire hazards.
PERFORMANCE CHARACTERISTICS
FLEXIBLITY (1/8” MANDREL)
METHOD: ASTM D1737
RESULT: Pass
HARDNESS SHORE D
METHOD: ASTM D2240
RESULT: 90
GLOSS @ 60°
METHOD: ASTM D523
RESULT: >95
ABRASION RESISTANCE
METHOD: ASTM 4060, CS 17, 1,000 gram load
RESULT: Loss/1000 cycles = 40 mg