Installation Instructions
mixing instructions continued
 ATTENTION
Add the Metallic Color Tint
™
 by pouring the 
ENTIRE CONTENTS of the container into 
the mixing bucket. Using a paddle mixer and 
a drill, thoroughly mix the tint in for 30-60 
seconds. Make sure to scrape the sides of 
the bucket with supplied paint stick to ensure 
all components and tint are thoroughly mixed 
together during the mixing process.
Application
ATTENTION: Use a 1/2” nap woven polyamide 
roller to apply this product. Also, do not pour 
material into a roller pan. This product is not 
designed to be applied out of a roller pan
NOTE: DO NOT OVER SPREAD 
MATERIAL. EACH BURST POUCH IS 
DESIGNED TO COVER 125 SF. 
Pour the mixed material from the bucket on the 
roughly 4’-5’ ribbons. Make sure the ribbon is at 
least 3-4” wide.
Using a 3” paint brush, cut the material in 
around the perimeter on half the area to be 
5’ x 5’ sections in an even coat across the 
will provide the most uniform results. NOTE: 
“see through”. You most likely will see some 
concrete through the coating system at this 
point. This is normal. Once one full section 
20’, use the roller to put circular patterns in the 
the majority of the coating system look opaque 
result. Continue to pour ribbons of material and 
apply in 5’ x 5’ sections to repeat the process 
above. When nearing the end of the batch, 
use a paint stick to remove any remaining 
spots while overlapping into previously coated 
areas by pouring your new ribbon of product 
approximately 2 feet away from the previously 
coated area. Use the roller to pull the material 
pouch. 
joints or roll over control joints. Control joints 
are not meant to be coated with this material. 
ANTI-SLIP:
™
product. Broadcast dry Silica Sand by grabbing 
thumb and throwing it up in the air over the wet 
coating as you go.