Installation Instructions
mixing instructions continued
ATTENTION
Add the Metallic Color Tint
™
by pouring the
ENTIRE CONTENTS of the container into
the mixing bucket. Using a paddle mixer and
a drill, thoroughly mix the tint in for 30-60
seconds. Make sure to scrape the sides of
the bucket with supplied paint stick to ensure
all components and tint are thoroughly mixed
together during the mixing process.
Application
ATTENTION: Use a 1/2” nap woven polyamide
roller to apply this product. Also, do not pour
material into a roller pan. This product is not
designed to be applied out of a roller pan
NOTE: DO NOT OVER SPREAD
MATERIAL. EACH BURST POUCH IS
DESIGNED TO COVER 125 SF.
Pour the mixed material from the bucket on the
roughly 4’-5’ ribbons. Make sure the ribbon is at
least 3-4” wide.
Using a 3” paint brush, cut the material in
around the perimeter on half the area to be
5’ x 5’ sections in an even coat across the
will provide the most uniform results. NOTE:
“see through”. You most likely will see some
concrete through the coating system at this
point. This is normal. Once one full section
20’, use the roller to put circular patterns in the
the majority of the coating system look opaque
result. Continue to pour ribbons of material and
apply in 5’ x 5’ sections to repeat the process
above. When nearing the end of the batch,
use a paint stick to remove any remaining
spots while overlapping into previously coated
areas by pouring your new ribbon of product
approximately 2 feet away from the previously
coated area. Use the roller to pull the material
pouch.
joints or roll over control joints. Control joints
are not meant to be coated with this material.
ANTI-SLIP:
™
product. Broadcast dry Silica Sand by grabbing
thumb and throwing it up in the air over the wet
coating as you go.