Installation Instructions
7
Using RockSolid
Decorative Chips
Once a strip across the entire back wall has
™
grabbing small pinches of chip between your
in the air over the wet coating. The density
or coverage of the chip thrown should be
broadcasting the chip to leave a wet edge.
that will not receive chip until the next section
of coating is applied and rolled into the wet
edge, allowing for a seamless application.
Once the next section has been rolled you may
broadcast chip again and continue this process
go. Up to 0.5 lbs. of chip can be used per 250
sq. ft. without adding an additional topcoat.
For heavier chip coverage and increased
chips can be used to complete a Heavy Partial
Chip Installation. The application process
will be unchanged except for one key point
MUST BE
SEALED USING THE ROCKSOLID FLOORS
DIAMOND COAT
®
in order to protect the
install the Clear Top Coat as soon as the
basecoat is able to be walked on or within 7
days of the initial application as long as the
®
suggests
a maximum chip broadcast of 2.5 lbs. for
EACH
®
Solid Color
density or coverage of the chip thrown should
broadcasting the chip to leave a wet edge. This
not receive chip until the next section of coating
is applied and rolled into the wet edge, allowing
for a seamless application. Once the next
section has been rolled you may broadcast
chip again and continue this system throughout
Please contact RockSolid Floors
®
Technical Support, toll free at 866-765-4474
with any questions or concerns. Or visit us
online:
www.rocksolidoors.com.
Partial Chip Installation