Installation Instructions
5
OTHER SUPPLIES NEEDED
MIX ONLY ONE POUCH
AT A TIME
combine ALL the Color Tint Cans together
before adding to the pouch material. To do
so, pour ALL the individual color tints into
a large plastic mixing container and blend
together with a paint stick until a uniform
color is achieved. Then pour the tint back
into the color tint containers evenly and add
to the pouch material one at a time. This will
ensure uniform color over the entire surface.
ATTENTION
A. Place tarp on the ground and thoroughly
mix the material in the pouch by shaking
and squeezing each side of the pouch. Any
clumps need to be massaged to break them
up and blend them in with the rest of the
are ready when you need them.
B. Combine the two components by placing
the pouch on the ground and rolling it from
the Part A side towards the Part B side
like a tube of toothpaste. This will create
pressure in the Part A side and force the
middle seal to burst, allowing the two
components to mix together. Thoroughly
mix the materials by shaking the pouch
back and forth and squeezing the edges
™
(optional)
COVERAGE: The porosity of the concrete
being coated and the application technique will
Kit provides the materials generally required
to cover 250 sq. ft. of concrete. This product
™
of this material to stairs, vertical surfaces or to
wood will have reduced coverage rates.
and corners towards the center of the
pouch. Mixing should be done for at least
activated and must be used within 1 hour.
ATTENTION: Each Polycuramine
™
pouch
will have a 1 hour pot life. That means
you have 1 hour to apply this product
to the concrete. Pot life will vary due to
temperature. As temperatures rise above 80
degrees pot life will be shortened.
Temperature Pot Life
1 hour
45 minutes
Chip System Installation
Mixing Instructions