Installation Instructions

5
OTHER SUPPLIES NEEDED
 
 
 
 
 
 
 
 
 
MIX ONLY ONE POUCH
AT A TIME

combine ALL the Color Tint Cans together
before adding to the pouch material. To do
so, pour ALL the individual color tints into
a large plastic mixing container and blend
together with a paint stick until a uniform
color is achieved. Then pour the tint back
into the color tint containers evenly and add
to the pouch material one at a time. This will
ensure uniform color over the entire surface.
ATTENTION
 
 
 
 
 
 
 


 
A. Place tarp on the ground and thoroughly
mix the material in the pouch by shaking

and squeezing each side of the pouch. Any
clumps need to be massaged to break them
up and blend them in with the rest of the

are ready when you need them.
B. Combine the two components by placing
the pouch on the ground and rolling it from
the Part A side towards the Part B side
like a tube of toothpaste. This will create
pressure in the Part A side and force the
middle seal to burst, allowing the two
components to mix together. Thoroughly
mix the materials by shaking the pouch
back and forth and squeezing the edges
 
 
(optional)
COVERAGE: The porosity of the concrete
being coated and the application technique will

Kit provides the materials generally required
to cover 250 sq. ft. of concrete. This product



of this material to stairs, vertical surfaces or to
wood will have reduced coverage rates.
and corners towards the center of the
pouch. Mixing should be done for at least

activated and must be used within 1 hour.
ATTENTION: Each Polycuramine
pouch
will have a 1 hour pot life. That means
you have 1 hour to apply this product
to the concrete. Pot life will vary due to
temperature. As temperatures rise above 80
degrees pot life will be shortened.
Temperature Pot Life
 1 hour
 45 minutes
Chip System Installation
Mixing Instructions