Installation Instructions

10
OTHER SUPPLIES NEEDED
 
 
 
 
 
 
 
 
 
 
MIX ONLY ONE POUCH AT A TIME
A. Place tarp on the ground and thoroughly
mix the material in the pouch by shaking

and squeezing each side of the pouch. Any
clumps need to be massaged to break them
up and blend them in with the rest of the

are ready when you need them.
B. Combine the two components by placing
the pouch on the ground and rolling it from
the Part A side towards the Part B side
like a tube of toothpaste. This will create
pressure in the Part A side and force the
middle seal to burst, allowing the two
components to mix together. Thoroughly
 
 
 
 
 
 


 
 
 
(optional)
mix the materials by shaking the pouch
back and forth and squeezing the edges
and corners towards the center of the
pouch. Mixing should be done for at least

activated and must be used within 1 hour.
ATTENTION: Each Polycuramine
pouch
will have a 1 hour pot life. That means
you have 1 hour to apply this product
to the concrete. Pot life will vary due to
temperature. As temperatures rise above 80
degrees pot life will be shortened.
Temperature Pot Life
 1 hour
 45 minutes
COVERAGE: The porosity of the concrete
being coated and the application technique will

®
Kit provides the materials generally required
to cover 250 sq. ft. of concrete. This product



Application of this material to stairs, vertical
surfaces or to wood will have reduced
coverage rates.
C. Once the material is thoroughly mixed, use
a scissors to cut a corner off of the pouch.
Then pour half the material into one bucket
and the remaining product in the pouch into
the other bucket make sure that each bucket
has the same amount of product in them.
MIX ONLY ONE POUCH AT A TIME.
ATTENTION
Add one entire Color Shot
into one bucket and
the other corresponding Color Shot
into the
other bucket. Use a paint stick to scrape the sides
to get all of the tint out. Using a paddle mixer
and a drill, thoroughly mix the tint in for 30-60
seconds. Make sure at some point to scrape
sides of the bucket to ensure all components
and tint are thoroughly mixed together.
Color System Installation
Mixing Instructions