Instructions / Assembly

D. Carefully inspect the surface to ensure that the entire surface is de-glossed. You
will know when de-glossing is complete when the entire countertop surface is
covered with small scratches.
E. Next, mask off the sink, appliances and all adjacent areas with smooth painter’s
tape and cover the sink drain. Spread the drop cloth on the floor along all base
cabinets. Apply smooth painter’s tape and plastic sheeting on the wall behind
the backsplash for proper adhesion.
F. Review “Application Drying Times” at the end of the instructions prior to
beginning project.
STEP #1 APPLY ADHESIVE BASE COAT
(Time: approximately 1 hour to apply on 50 square feet of countertop space)
Once the countertop has been prepared, you will apply the Adhesive Base
Coat that will adhere to the old countertop and bond the Decorative Chips
to the new surface. If you have a section that is over six (6) feet long, have a
second person help you apply the Adhesive Base Coat.
IMPORTANT: Complete de-glossing is CRITICAL for proper coating system
performance.
IMPORTANT: Contents of the Protective Top Coat are combustible until
applied to the surface. Extinguish all flames and pilot lights, and turn off
stoves, heaters, electric motors and other sources of ignition during use until
project is complete. Keep away from heat, sparks and flame. Do not smoke.
HOUR
1 HOUR
Tools needed: Adhesive Base Coat, Stir Stick, Wetting Agent and Trigger,
6 inch 3/8” Nap Microfiber Roller, Roller Frame, Mini Roller Paint Tray,
2” Synthetic Paint Brush, and Disposable Gloves