Use and Care Manual

TECHNICAL DATA
ROCKSOLID
®
POLYCURAMINE
®
PROFESSIONAL FLOOR COATING
Form: TDS-1372
Rev.: 070717
2
.PRODUCT APPLICATION (cont.) .
ROLLER APPLICATION
Pour the contents of the pouch directly onto the floor in a
2-3” wide ribbon about 4’ long. Cut in using a good quality
synthetic brush. Roll out the ribbon evenly working in 4’ x
4’ sections in an “M” and “W” pattern. Continue working in
4’ x 4’ sections, pouring a new ribbon 2’ away from the
previous section. Use the roller to pull the material back
first; then push forward to fill in the void between sections.
Overlap into the previously coated areas while taking care
to avoid creating thick spots.
If decorative chips are to be used, toss the decorative
paint chips onto the wet coating. Leave a 6”-12” section of
wet film without decorative chips. This section will be
rolled into when coating the next 4’ x 4’ area. Skip this
step if paint chips are not desired. The coating
performance will not be affected.
Do not coat or roll over control joints. Use a flexible control
joint fill material if desired. Repeat the above steps for
each additional pouch.
SQUEEGEE APPLICATION (for large areas)
Pour mixed material onto the floor in a large ribbon about
12” wide, starting about 12” off the wall. Cut in using a
good quality synthetic brush. Using a 1/8” notched
squeegee, spread the material thin and even over the
surface. Once an area of about 6-8 feet has been spread,
use a roller to back-roll the material to even it out. With a
fully saturated roller, use an “M” and “W” pattern to spread
the coating on the floor evenly. Follow up with a cross-roll
perpendicular to your original roll. Only one coat is
necessary. Product must be used within the pot life
indicated (see Application Chart) or gloss and color may
appear uneven.
Do not coat over control joints or roll over control joints.
Use a flexible control joint fill material if desired.
Repeat the above steps for each additional pouch.
COVERAGE RATE
Each pouch covers up to 200-250 square feet. Coverage
may vary based on condition and porosity of the concrete.
DRY TIME
Temperature and humidity may affect drying time. Do not
walk on the coating while it is still tacky. Surface should be
ready for foot traffic in 8-10 hours and vehicle traffic in 24-
36 hours depending upon temperature and humidity.
.PRODUCT APPLICATION (cont.) .
CLEAN-UP
Clean tools and equipment with mineral spirits. Allow
unused product o harden in container and dispose
according to local regulations.
LIMITATIONS
This product must be installed at the specified spread
rates to perform as described. Do not apply in direct
sunlight. Do not apply product when the substrate and
ambient temperatures are steadily below 40°F (4°C).
SHELF LIFE and STORAGE
Twenty-four (24) months in factory delivered unopened
pouches. Keep away from extreme heat, cold and
moisture. Maintain at a proper storage temperature of 45-
90°F. Keep out of direct sunlight and away from fire
hazards.
.PERFORMANCE CHARACTERISTICS .
Flexibility, ⅛” Mandrel (ASTM D1737) Pass
Hardness, Shore D (ASTM D2240) 90
Gloss (ASTM D523) @ 60° >95
Abrasion Resistance (ASTM D4060)
CS-17 Wheel, 1,000 g load, 1,000 cycles 40 mg