TECHNICAL DATA
RESTORE
®
4X DECK COAT
2 Form: GDH-443
Rev.: 030215
PRODUCT APPLICATION (cont) .
PRECAUTIONS & TEMPERATURE SAFEGUARDS
DO NOT APPLY IF RAIN IS EXPECTED WITHIN 48 HOURS
OF APPLICATION. Apply when sir and surface temperatures
are between 50-90°F (10-3C) for a full 72 hours (day and
night) after application.
APPLICATION
TWO THICK COATS OF RESTORE 4X DECK COAT ARE
REQUIRED
Thoroughly mix the material with a power drill to ensure any
settled pigment is re-dispersed and stir occasionally during use.
Box material if using more than one container to ensure color
consistency.
Before applying Restore 4X Deck Coat to the horizontal portions
of the deck, first coat vertical surfaces such as deck posts,
railings or balusters. Next cut around edges with a brush and
coat visible areas between deck boards.
Using either a or ½ nap roller, saturate the roller cover and
apply generously in a consistent pattern. Work to a wet edge at
all times. Avoid rolling back into coated areas where drying has
begun. Coat 1 to 2 boards at a time.
After coating 1-2 boards, use a putty knife or other straight edge
to remove excess coating between boards. Difficult areas such
as warped or cupped boards will require rolling across the
narrow width of the board as well as the length to ensure
complete coverage. Allow the first coat to dry 4-6 hours. Extend
the dry time if the surface is tacky or soft. Drying times vary
depending on temperature and humidity. Apply a second coat
using the same method described above. Allow the second coat
to dry for 24 hours before light foot traffic and 3-5 days before
replacing furniture. If the surface is tacky or soft, extend the
drying time before putting heavy objects back in place. Full cure
to a hard finish will take approximately 3-4 weeks.
PRODUCT APPLICATION (cont) .
DRY TIMES
Dries to the touch in 2 hours and can be recoated in 4-6 hours.
Longer dry time is required in cooler temperatures and at higher
humidity. Surface is ready for light foot traffic after 24 hours. Allow
3-5 days before replacing furniture. Full cure to a hard finish will
take approximately 3-4 weeks.
COVERAGE
1 gallon covers up to 80 square feet with two coats.
CLEAN-UP
When finished, wash tools and equipment with mild soap and
warm water. Properly dispose of all soiled rags and protect
unused product from freezing.