User's Manual

RNU4000BS Base Station User Manual
44 Runcom Technologies Ltd.
5 Field Test Performance Evaluation
The purpose of this document is to validate in the field performance of Runcom system that includes
base station and CPEs (with or without NOC) in the operation modes. The field tests cover MIMO-A
(Matrix A or SISO) and MIMO B (Matrix B).
This document contains the following main sections that describe the test performance:
Throughput performance per CINR and MCS (modulation coding scheme)
The table below describes the test equipment list and the associated accessories in order to perform the
test as described in this document
Equipment QTY Parameters
Outdoor Compact BTS 4x4 1 4x30dbm, 65 or 90 degrees sector
antenna 16dbi
IDU CPE 2 2x24dbm, panel antenna 2x7dbi or
2x15dbi
ODU CPE 2 2x24dbi, omni antennas 2x5dbi
USB 2 1x17-20dbm, on board antenna
CNOC 1 License for 100 subscribers
RF Configuration
BW 10MHz (or 5MHz)
TX/RX symbols ratio 32/15 (or 26:21 for higher UL)
TX power 4x0dB MAX
4X30dB MAX
for Lab test
for field test
DL Modulation max QAM 64 2/3 For mobile
UL Modulation max QAM 16 ¾ For mobile
Network Configuration
Service Flow
Default
BE, UGS, nRTPS CIR 64Kb
MIR DL 40Mbs/UL 40Mbs
All users
Advance Configuration
Special settings MIMO-B mode
BS CINR Threshold table
parameters
BS Synch Configuration GPS for external use
Internal clock
For field test
For Lab test
5.1 Field Test Overview
The field test testing procedures is used to evaluate the throughput performance and the base station
sector coverage performance in LOS and N-LOS environment. To get more robust reliable measurements
results for better analysis the recommended conditions for the testing points are LOS environment.
Note: