User's Manual
RNU4000BS Base Station User Manual
24 Runcom Technologies Ltd.
3 Commissioning Procedure
3.1 Overview
Before mounting the RNU4000BS BS on a pole or wall, power should be connected to the
BS and the basic parameters configured with the basic parameters using the BS WEB GUI.
ATTENTION!!! BE SURE THE RF ANTENNAS ARE CONNECTED OR THE RF
PORTS ARE TERMINATED BEFORE CONNECTING POWER TO THE UNIT.
The BS commissioning procedure consists of the following steps: