Runco WindowWall Installation Guide 23
Wall Installation
Before you start building your wall, keep the following points in mind:
A structure that is plumb and flat will greatly reduce issues with mounting and
alignment of the Runco WindowWall system.
Brackets are to be installed first - do not remove LCDs from their boxes until the
entire wall of brackets is installed, level and plumb.
For each row of brackets, build from the center outwards.
After each row of brackets is built, check it for level and plumb.
All brackets in a row should be level with the bracket next to it within ±0.1°.
Each bracket should be square with the level surface by ±0.05°. Bracket wall
planarity should not exceed ±0.5mm.
For optimal product performance, maintain components within temperature
specifications. Occasional temperatures out of specification are acceptable for a
short period of time.
Wall Installation Options
There are three main types of Runco WindowWall installations:
Standard installation - mounted to a wall
Column floor stand - maximum of three high without additional support
2 x 2 free-standing mount