Create opening in dedicated wall:
1. Locate three studs 48 inches apart.
2. At the center of the middle stud, mark the location of the screen center based on the
desired screen height.
3. From this point, measure/mark 44.375 inches to the left and to the right and the
appropriate distance above and below (25.25 inches for a VW-100HD; 18.94 inches
for a CW-95HD).
4. Using a laser level, determine and mark the locations of the opening corners.
5. Double-check your measurements. “Measure twice, cut once” is always a great
rule of thumb to follow.
6. Using the marks as a guide, cut a rectangular opening 88.75 inches wide and of the
appropriate height (50.5 inches tall for a VW-100HD or 37.875 inches tall for a
CW-95HD).
Reinforce opening in dedicated wall:
1. At the rear of the dedicated wall, cut away the intermediate studs (three or five,
depending on spacing) 1.5 inches below the bottom edge and 11.5 inches from the
top edge of the opening.
2. If you are installing a VW-100HD: Reinforce each outer stud with two, 2x6 x 73 in.
reinforcing studs and one, 2x6 x 21
in. reinforcing stud. (This assumes that the
bottom edge of the opening is 24 inches from the floor.)
– OR –
If you are installing a CW-95HD: Reinforce each outer stud with two, 2x6 x 73 in.
reinforcing studs and one, 2x6 x 33.625
in. reinforcing stud. (This assumes that the
bottom edge of the opening is 36.625 inches from the floor.)
VideoWall VW-100HD:
50.500" (1282.7 mm)
CineWall CW-95HD:
37.875" (962.0 mm)
24.000"
(609.6 mm)
36.625" (930.3 mm)
88.750" (2254.3 mm)