Owner`s manual

Installation Preparation
12 VideoWall™/CineWall™ Installer/Integrator Manual
PRE
L
IMINAR
Y
Power Requirements The VideoWall/CineWall requires clean, noise-free AC power. The power cord provided
with the VideoWall/CineWall is 6 feet (1.83 meters) long. In order to use it, the power outlet
must be no more than 48 inches (1.22 meters) from the cable openings on the right side
of the chassis. If the outlet is farther away, substitute a longer power cord for the one
provided with the VideoWall/CineWall; do not use a power strip or extension cord. If you
use a substitute power cord, ensure that it is a UL- or CSA-approved, three-conductor
(18
AWG or heavier), shielded cord rated at 10 amps minimum.
Site Access The VideoWall/CineWall is shipped in two containers: one for the screen assembly and
one for the chassis and related hardware. The shipping container dimensions are as
shown below.
Ensure that the site has a “carry-in” path with sufficient clearances leading to the
installation location. This is particularly important in corners in stairways, landings and
hallways.
101.13 in. (2,568 mm)
7.5 in.
(190 mm)
61.5 in.
(1,562 mm)
Chassis/HardwareScreen
86.25 in. (2,191 mm)
30.0 in.
(762 mm)
58.5 in.
(1,486 mm)
A
A 2,000 mm
B 4,000 mm
C 1,900 mm
D 1,200 mm
E 2,400 mm
F 3,700 mm
B
C
D
E
D
F
A
Minimum Stair/Landing Clearances