Installation guide
17
Preparing the 7782 Access Point at the Depot and Shipping to the Field
Powering the AP
Powering the AP
NOTE: You only need to connect one type of power source at this point, even if you are
planning to use both PoE and AC power in your final deployment.
Apply power to the AP and check the LED operation using one of these two methods:
• “Powering the 7782 with AC” on page 54
• “Powering the Access Point with PoE” on page 56