Configuring the Access Point
Configuring for Management by ZoneDirector
4. Connect one end of the other Ethernet cable to the NETWORK port on the PoE
injector, and then connect the other end to ZoneDirector directly or through a hub.
5. Connect the power jack to the DC 48V IN connector on the PoE injector, and then
plug the power adapter to a power source. The single LED on the PoE injector turns
green.
6. Check the Power LED on the side of the Access Point. Initially, the LED will turn red as
the AP powers on. After it completes the power-on sequence, the LED will turn green.
Figure 11. Connect the Ethernet cables and power adapter to the PoE injector
You have completed connecting the Access Point to the network and to a PoE power
source.
Use DC Power
To use DC to power the Access Point, you need to assemble the DC cord connector, and
then plug it into the 12V DC connector on the AP. To complete this task, you will need:
A 0.195” to 0.265” diameter DC cable that is long enough to connect the AP (at its
mounting location) with the DC power source.
A pair of long nose pliers
A soldering gun (optional)
To assemble the DC cord connector and supply DC power to the AP
1. Take the small plastic bag containing the DC connector pins and DC cord connector
from the AP package. Take its contents out.
2. Feed the end of the DC cable through the boot, cable clamp housing, and coupling
ring (in the same order). See Figure 12
.
To AP
To network
To A C po w e r s o u r ce