Installation manual

Document number 900-20574 Rev. A
8
System Power
CAUTION: NEVER HOOK UP OR DISCONNECT ANY EQUIPMENT WITH POWER
TURNED ON!
The Inspection System requires a steady supply of 120VAC to operate properly.
Before starting of the generator or connecting shore power, make sure that ALL
equipment inside the vehicle has been turned OFF. Turn down the controls for camera
power and cable reel speed. After all equipment has been checked, connect the shore
power cord.
If a generator is to be used, allow the generator to warm up for a few minutes.
Note: Diesel generators use a different control panel that is separate from the controller
power supply. Refer to the appropriate generator operators manual for starting.
Verify that the voltage and frequency indicators on the controller power supply are in the
green normal zone.
Caution: Before turning on any equipment, plug the keyboard into the data
collection system. Plug the Auxiliary Control Box into the Auxiliary Control jack
on the controller power supply.
Caution: If the voltage or frequency fluctuates into the red zones on the controller
power supply, DO NOT turn on any of the equipment in the truck. Check shore
power or the generator for proper operation, or have them checked by a qualified
technician.
Caution: Route cords away from traffic or wet areas to avoid tripping on power cords.