Installation Instructions
Eclipse
™
Energy Guard
PO Box 1110 | Alexandria, LA 71309
(800) 299-5174 | royomartin.com
4.0 Typical Door Installation
Product Information & Installation Manual 04
4.1 Fasten Eclipse™ Radiant Barrier Panels to wood
frame and apply
approved Energy Guard tape as
detailed in section 2.0.
(See Figure 4.1)
Printed October 2009 I Made in the USA I © 2009 RoyOMartin
Figure 4.2A
Figure 4.1
4.2 Measure and cut IBC-approved adhesive ashing
length at least 2 inches longer than
vertical length
of
door jamb.
(See Figure 4.2A)
Flashing width should be sufficient to cover door
jamb plus 2 inches on exterior Eclipse™ Radiant
Barrier Panel.
(See Figure 4.2B)
Notch, fold and apply flashing to cover door jamb.
Install on vertical sides of door jamb.
(See Figure 4.2C)
Figure 4.2B Figure 4.2C
4.3 Measure and cut IBC-approved adhesive ashing
length at least 2 inches longer than
horizontal
length of
the head door jamb.
(See Figure 4.3A)
Measure and cut flashing width sufficient to cover
head door jamb plus 2 inches on exterior
Eclipse™ Radiant Barrier Panel.
(See Figure 4.3B)
Notch, fold and apply flashing to cover head door
jamb.
(See Figure 4.3C)
HEIGHT
OF DOOR
JAMB
PLUS
2”
WIDTH
OF DOOR
JAMB
PLUS
2”
2”
2”
Figure 4.3A Figure 4.3B Figure 4.3C
2”
2”
WIDTH
OF DOOR
JAMB
ON
EXTERIOR