Installation Instructions
29
Garage Door Stop
Approx. 
8
”
y
Install the jamb 
SLHFHVÀU
st, then 
the header.
y
Position the stop so 
the weather strip is 
in contact with the 
garage door. The 
inside of the stop’s 
base will be 
approximately 
9
” 
from the garage 
door
. 
y
Fasten the stop in 
place with color 
coor
dinated 
galvanized or 
stainless steel trim 
nails in the pre-
punched holes or at 
approximately 8” 
int
er
vals. 
y
Trim the weather 
stripping on the 
header piece t
o 
create a mitered 
look and help k
eep 
a continuous seal. 










