Project

10
Measure
6.1 Measure Support Cleat length
Th e distance between th e frame supports
could differ, so measure each board for proper fit.
Th e portion of th e cleat system to mounted to th e
wall sh ould be ripped ½ narrower th at th e support
cleats. Th is will aid in th e h anging of th e boards.
6.2 Cut and Bore
Cut th e top cleat and mount it to th e supports
with PVC glue and screws
N O TE : th is part is directional, so mak e sure
th e angled side is facing th e back of th e board.
6.3 Attach to the leg Assembly
U sing th e same measurement as th e top
cleat, cut th e cross member for th e bag storage
compartment. Mount it to th e bottom portion of th e
interior support frame.
N O TE : L eaving a ½ gap at th e bottom of th e
bag storage cross member with allow water and
debris to escape.
S tep 6 W all H anger / B ag
S torage
C ut and F asten
A ttac h c ross m em b er
Measure
6.1 Measure Support Cleat length
Th e distance between th e frame supports
could differ, so measure each board for proper fit.
Th e portion of th e cleat system to mounted to th e
wall sh ould be ripped ½ narrower th at th e support
cleats. Th is will aid in th e h anging of th e boards.
6.2 Cut and Bore
Cut th e top cleat and mount it to th e supports
with PVC glue and screws
N O TE : th is part is directional, so mak e sure
th e angled side is facing th e back of th e board.
6.3 Attach to the leg Assembly
U sing th e same measurement as th e top
cleat, cut th e cross member for th e bag storage
compartment. Mount it to th e bottom portion of th e
interior support frame.
N O TE : L eaving a ½ gap at th e bottom of th e
bag storage cross member with allow water and
debris to escape.
S tep 6 W all H anger / B ag
S torage
C ut and F asten
A ttac h c ross m em b er
Step 6: Wall Hanger / Bag Storage
6.1 – Measure Support Cleat Length
The distance between the frame supports could differ,
so measure each board for proper fit. The portion of the
cleat system to be mounted to the wall should be ripped
½” narrower that the support cleats. This will aid in the
hanging of the boards.
6.2 – Cut and Bore
Cut the top cleat and mount it to the supports with PVC
glue and screws
NOTE: this part is directional, so make sure the angled
side is facing the back of the board.
6.3 – Attach to the Leg Assembly
Using the same measurement as the top cleat, cut the
cross member for the bag storage compartment. Mount
it to the bottom portion of the interior support frame.
NOTE: Leaving a ½” gap at the bottom of the bag
storage cross member with allow water and debris to
escape.
Measure Cut and Fasten
Attach Cross Member