Installation Guide
• INSTALL WITH 3/8 IN.
MINIMUM STAPLES.
• APPLY STAPLES 6-12 IN.
APART ON THE UNIT.
• WHEN SPLICING TWO
ROLLS TOGETHER OVER-
LAP WITH 2 IN.
• APPLY ROTBLOC 4X BEAM
TO THE TOP OF THE BEAM
EDGE WITH THE PRINT ON
TOP FACING UPWARDS.
NON - TOXIC
4X BEAM4X BEAM
NON-REACTIVE TO CHEMICALS
IN TREATED LUMBER PRODUCTS.
INSTALL
100%100%
RECYCLABLE
• INSTALL IN HOT OR COLD
WEATHER.
• INSTALL ON WET OR DRY
•• NOTE:NOTE: TO PREVENT CORROSION, STAINLESS STEEL STAPLES ARE RECOMMENDED.

