Installation guide
Page 31 of 40 September 2005 Synergy 2 SD Ordering Guide, v16A
An exception to the above criteria is rack frame and control panel power supplies. These are
expensive parts and spares are ordered separately.
Critical Spare Boards Kit S2-074
This is a package of critical boards for which there is no redundancy within the Synergy
Switcher. It includes:
• Frame Controller Board (Main Chassis CPU)
• Aux Bus Board
• MLE Carrier Board
• Panel Controller Board (Control Panel CPU)
Custom Cable for Main Panel S2-075-xxx
(sold by the meter)
This cable connects the control panel to the electronics rack frame. It is a shielded 8-pin
Telco cable and the ends are finished with the appropriate connectors. The control panel
and rack frame can be separated by a maximum of 300 meters.
The switcher comes standard with a 10-meter control panel cable. If lengths of other than
10 meters are needed, this option is required. The -xxx portion of the part number
represents the total cable length in meters.
For example: a 50-meter control panel cable is required. Order:
• quantity 1 of S2-075-050.
Redundant Power (Control Panel only) S2-076A
Redundant power for those who have upgraded their panel and already have redundant
power in their frame.
Additional Maintenance Guide S2-080
This manual provides information regarding the maintenance of the Synergy 2 control panel
and chassis. It also includes the procedures for installing various options.
Additional Operation Guide S2-081
(Includes S&T WARP Owner’s Guide)
These manuals contain all of the information required to run the switcher on a day-to-day
basis.
Additional Installation Guide S2-082
This manual contains instructions on how to install the switcher into a facility. It explains
how to connect external devices to the switcher. It also covers after-sale option installation.
Synergy Onsite Operational Training S2-090
- 1
ST
Day
Training courses can be conducted at the customer’s site or at Ross facilities. Expenses are
included in North America. A minimum of four weeks advance notice is required for
training to ensure we can efficiently schedule the best possible training staff for your
requirements. Onsite training is provided on customer’s switcher.