Workflow for installation, debugging, acceptance and handing over of the equipment is shown above
Figures .
The installation and commissioning workflow is as follows:
1. Engineering survey
Inspect the suggested site environment to provide related data for design and engineering.
2. Engineering design
Planning department shall design according to the engineering inspection results and make out
relevant design comments and drawings.
3. packing acceptance
After equipment delivery at the site, construction team is responsible to specify the unpacking time
according to engineering preparations. The construction team, the operator, the engineering team
and Rosenberger shall all be present at the time of unpacking inspection. If any damage to
equipment or shortage in shipment is found during unpacking by a single party, only the unpacking
party shall bear all the liability.
4. Hardware installation
Qualified engineering personnel shall supervise the whole installation process, including positioning,
base installation, BSC rack installation, BSC board installation, DC power installation, and
connection of internal and external cables.
5. System and power-on check
Conduct necessary check and power-on the equipment after installation.
6. Parameters settings
Set related parameters after installation.
7. System test
Test the system to check if the system operates normally. If it fails the test, adjust the system to meet
the requirements.
8. Trial run
In the first few months after equipment commissioning, the equipment remains in trial run stage.
Rosenberger is responsible for offering full technical support to the user.
9. Final acceptance