Reference Manual

14
Reference Manual
00809-0100-4045, Rev AB
Hardware Installation
March 2016
Hardware Installation
4. Open the Isolate (block) valve to return the device to service.
Adjusting valve packing
Over time, the packing material inside a Rosemount manifold may require adjustment in
order to continue to provide proper pressure retention. Not all Rosemount manifolds have
this adjustment capability. The Rosemount manifold model number will indicate what type
of stem seal or packing material has been used.
The following steps are provided as a procedure to adjust valve packing.
1. Remove all pressure from device.
2. Loosen manifold valve jam nut.
3. Tighten manifold valve packing adjuster nut
1
/4 turn.
4. Tighten manifold valve jam nut.
5. Re-apply pressure and check for leaks.
6. Above steps can be repeated, if necessary.
If the above procedure does not result in proper pressure retention, the complete manifold
should be replaced.
A. Bonnet
B. Stem
C. Packing
D. Ball seat
E. Packing adjuster
F. Jam nut
G. Packing follower
Device
Test/vent
(closed)
Isolate
Process
(open)
A
B
C
D
E
F
G