Installation Guide

Pinnacle Rubber Wall Base
Installation
Page 3 of 3 | © Roppe Corporation, Printed in the U.S.A. | July 17, 2015
It is important to always roll the wall base in the direction of the last piece installed. This practice will
ensure a tight fit at the seams.
Bond the wall base to the wall within 15 minutes after adhesive application and lightly roll with a hand
wall base roller or smooth with a soft wet cloth to ensure proper adhesive contact.
Periodically check the back of the wall base to make sure good adhesive transfer occurs.
When installing Pinnacle Standard Toe wall base in coils, the toe area must be adjusted along the
toe’s horizontal factory molded relief area prior to installation in order for the wall base’s toe to fit flush
against the floor & to ensure the correct wall base height is achieved.
If the toe is not adjusted along the molded relief area, the toe will not lay flat and the wall base will
extended above the desired height.
Pinnacle wall base and corners appearance can be enhanced by using Roppe’s matching Colored
Caulk to fill any voids or imperfections.
Allow wall base to remain undisturbed for 72 hours after installation to allow the adhesive to properly
cure.