Product Manual

TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336
www.tiedown.com (404) 344-0000 Fax (404) 349-0401
081310,E1136
Instruction Sheet #08131
TranzSporter Hoist Stabilizer
Assembly Diagram
Part #48599
A
I
I
F
G
G
B
C
C
C
D
H
H
H
E
D
D
E
E
D
E
D
E
D
E
C
B
A
The Hoist Stabilizer is manufactured and tested to meet or exceed OSHA standards (1926.1053).
The Hoist Stabilizer is designed for use with TranzSporter Platform Hoist models LH200 and LH2000 track
sections. Warning: Failure to read instructions, as well as follow OSHA, local and State regulations may
result in serious injury or death.
WARNING
Never exceed maximum intended load of hoist
Never stand on or use the tie bar to hold weight
Use extreme caution and maintain balance when using Hoist Stabilizer
Never use The Hoist Stabilizer if damaged or missing fasteners
Always make sure that Hoist Stabilizer is secured with tethering pins prior to each use
Stay 14 feet away from energized power lines
# Parts Qty.
A Left and Right Side Rail 2
B Upper and Lower Bracket 2
C 1/4”-20 x 1.75” Carriage Bolts 8
D Washer 1/4” 10
E Nylon Nut 10
# Parts Qty.
F Tie Bar 1
G 1/4”-20 x 1.5” Carriage Bolts 2
H Cable Tethering Pins 4
I Non-Marring Bumper Feet 2
Slide the Hoist Stabilizer brackets
over the platform rung until they are in
contact with the rung.
Slide tethering pins through the
bracket holes making sure that they
also go through the hole in the back of
the bracket.
H