Product Manual A

Red: 0-100-100-0
Blue: PMS 293
100-56-0-0
Color Logo use on white background only
Black Logo use on white background only
White Logo use on black background only
TP250
250 lb. Capacity
TP400
400 lb. Capacity
E1399: 041817
4 color
TIE DOWN ENGINEERING • Atlanta, GA 30336
www.tiedown.com (404) 344-0000
TIE DOWN ENGINEERING • Atlanta, GA 30336
www.tiedown.com (404) 344-0000
Instructions #08238
Updated: 4-18-17
For the Most Up to Date Information and
Instructions, Visit the TranzSporter Web Site
at www.tranzsporter.com.
Platform Hoist
Owners Manual
CRITICAL SAFETY INFORMATION: The greatest exposure to serious bodily injury and or death may occur when the
Transporter track sections are located within 40 feet of overhead electric power lines. When a Transporter ladder hoist has to be
installed within the minimum safe distance zone of 40 feet, a COMPETENT PERSON must be present during any set up, during
any repositioning, and during any tear down operations of the Transporter track sections. The COMPETENT PERSON must
recognize the location of all electric power lines in order to supervise and assure that the proper installation, repositioning, and
tear down procedures as contained within the owners operating manual and safety warning decals present on the Transporter
are stringently observed by all individuals involved in these procedures.