Product Manual A

9
Replace
Top Cap
3/8”x 3/4”
Carriage Bolts
“S” Hook Mount
Replace & Tighten
3/8” Keeper Nuts
Step 6
Lay one track section on a flat floor with the “front” side up. This is determined by the space between the
track cross bar and the track section edge as shown above.
Step 7
Attach splice plates to the bottom section of the track. Splice plates are mounted on the outside track
section. Slide the top section track into the groves on the inside track section, attach with 2 nuts and
bolts per side (shown above).
NOTE: DO NOT SUBSTITUTE NUTS AND BOLTS
Use 3/8”x 3/4” carriage bolts and 3/8” keeper nuts
(lock washer and nut combined).
Step 8
Reattach the top cap to the end of the last section of
track section you intend to use. Assemble with two
3/8”x 3/4” carriage bolts with keeper nuts provided.
Make sure that the top cap end slides into the
outside of the track section (shown right).
Important: Make sure the mounting hole for the “S”
hook is located on the back of the hoist assembly.
Step 5
“Roll”carriage assembly onto the base. At
this time lock the base in place using the
Safety Pin as shown. Important: Always
check for wear or damage to the safety pin
cable/pull ring assembly. Failure to replace
damaged safety pin cable assembly may
cause damage or personal injury.
Front
Back
3/8” x 3/4” Carriage Bolts
3/8” Keeper Nuts
Front
Back
3/8” x 3/4” Carriage Bolts
3/8” Keeper Nuts
TP400 Assembly Instructions