Product Manual A
8
Assembly Instructions for the TP400 Hoist
Congratulations on purchasing the TranzSporter TP400 Hoist. Please read the following instructions completely
before starting assembly.
Step 4
Adjust Tension Bracket - Make sure the TP400
carriage rollers are on track, and the carriage
rolls easily. There are two adjustable track
roller guides on the inside carriage assembly
(see right). Turn the nut clockwise/counter
clockwise the adjust the tension (free play)
between the carriage and the tracks. If the
carriage moves too much in and out, tighten
the adjustable tension bracket nut. Correct
adjustment should alow for minimal contact
between the carriage and the tracks
Step 1
If you have not already assembled the carriage assembly,
Stop Now. You must first assemble the carriage,
follow the assembly instructions included in the #2 Box -
“Collapsible Carriage & Plywood Attachments”.
Remove
3/8” Keeper
Nuts
Step 2
Remove base section from its box and place on a
clean floor or assembly area. Remove the top cap
with a 7/16” wrench (one bolt/nut on each side).
Step 3
Starting at the top of the track section slide carriage
assembly onto track section so that the four rollers
connect to the top rail of the track section.
Adjustable Inside Track Roller
Guide Tension Bracket
TP400 Assembly Instructions