Product Manual A
6
Step 5
Lay one track section on a flat floor with the “front” side up. This is determined by the space between the
track cross bar and the track section edge as shown above.
Step 6
Attach splice plates to the bottom section of the track. Splice plates are mounted on the outside track
section. Slide the top section track into the groves on the inside track section, attach with 2 nuts and bolts
per side (See above).
NOTE: DO NOT SUBSTITUTE NUTS AND BOLTS
Use 3/8”x 3/4” carriage bolts and 3/8” keeper nuts
(lock washer and nut combined).
Step 7
Reattach the top cap to the end of the last section of
track section you intend to use. Assemble with two
3/8”x 3/4” carriage bolts with keeper nuts provided.
Make sure that the top cap end slides into the outside
of the track section (shown right).
Important: Make sure the mounting hole for the “S”
hook is located on the back of the hoist assembly.
Step 4
“Roll”carriage assembly onto the base. At this
time lock the base in place using the Safety Pin
as shown. Be sure to loop the lanyard over the
carriage base as shown.
Important: Always check for wear or damage
to the safety pin cable/pull ring assembly.
Failure to replace damaged safety pin
cable assembly may cause damage or
personal injury.
Front
Back
3/8” x 3/4” Carriage Bolts
3/8” Keeper Nuts
Front
Back
3/8” x 3/4” Carriage Bolts
3/8” Keeper Nuts
Replace
Top Cap
3/8”x 3/4”
Carriage Bolts
“S” Hook Mount
Replace & Tighten
3/8” Keeper Nuts
TP250 Assembly Instructions