Install Manual

Installation
7
PART C: Installation
1. Installation of Brackets
(1) Inspect the location
Once you find where you want to install
RT- Roof Entry Bracket, please make sure
there are no cables, lights or any objects
under roofing and sheading.
Location must be selected following
the condition from PART B,
installation condition.
(2) Marking the installation spot
Using the template to mark the
location of the base. The base shall
be 1 3/16 inch (30mm) away from the
side edge of shingle roofing gap, 2 3/8”
(60mm) away from upper shingle
course. Mark the center of the hole.
Follow installation requirements to
avoid the risk of water leakage.
Attention
!
Hole location
Guide sheet