Install Manual
Installation Safety
2
Tools & Supplies Required for Assembly
Tools needed for building the array
・Hex wrench bit socket (8 mm)
・Holesaw(φ45mm、φ1-3/4 inch)
・Drill andφ3 mm Drill Bit for sheet metal (for Installation on Metal Roof)
・Measuring tape
・Marker pen
・Torque wrench
・Scissors
Item
Torque
4.0x16 Screw
1.5 - 2 N・m (14 - 18 in lbs)
5.0x60 Wood Screw
Fully seat*
Installation Safety
The installation process requires working on sloped and elevated building
surfaces, in outdoor weather conditions, using tools and heavy components
designed for the generation of electricity.
・ Use properly anchored fall protection equipment.
・ Use caution to prevent objects from falling or dropping off the roof area.
・ Cordon off ground areas directly beneath the roof work area when possible.
・ Always use personal protection equipment such as safety glasses, gloves, etc.
・ Do not perform installation in excessively wet, windy, or inclement weather
conditions.
・ When working in hot weather, work crews should take care to prevent
symptoms of over-heating or dehydration.
・ Use proper lifting and carrying techniques when handling heavy components
at the job site. If conditions are challenging for moving PV modules to the roof
area, use a mechanical lift.
・ Follow best practices when working around high-voltage electrical equipment.
・ Do not anchor fall protection equipment to roof mounts, or any other
inappropriate roof structure