Install Manual
Installation
16
③ Once all the wires are installed, the
entry hole shall be filled with the sealing
putty. The sealing putty will prevent all
moisture and dust from getting inside
of the roof.
Sealing putty can be installed in 3 steps.
(1) Fill the sealing putty from the ridge side of the hole.
(2) Fill the edge side and under the wires.
(3) Place the rest of the putty on top of the wires to cover.
※To make the best waterproof, Sealing putty shall be installed between the wires.
Point
■Sealing putty
■Sealing putty