Install Manual
Bracket Installation
9
(3) Bracket Installation
① Mark the location at the intersection of the Y Line and M Line.
Minimum clearance between mounting screws and the
edge of the roofing shingle shall be 3/8 inch (10 mm).
In case the stainless screw hit the nail underneath the
shingle;
1) Tip the driver at an angle.
2) Use a 3 mm steel drill to make a hole.
3) If possible, remove the nail from underneath.
Attention
!
To maintain the flashing performance, avoid installation
when the temperature is below 22F or above 176F.
RT Butyl must be installed on a dry surface.
Attention
!