Install Manual
Electrical Setup
69
Example of Bonding Path ①
In order to properly ground the PV modules and the brackets to the equipment
ground, a grounding lug or lay-in lug must be attached to the PV module or the
RT-APEX’s U-D Bracket at the end of each row. When the skirt is bonding the
adjacent rows, there is no need to attach the grounding lug at the end of each
row (see examples 2 and 3) Notice that the PV frame is part of the bonding
path.
Note: Grounding, Bonding lugs and Straps are not provided by Roof Tech Inc.
(See Page 10)