Install Manual

Splice Installation
49
(3) End Splice and the First Row Panel Installation
Place the PV panel on the U-D
Splice.
Make any adjustment then
tighten the Head cap screw
M10 to 142 in-lbs (16 Nm)
or 159 in-lbs (18Nm) torque
(see appendix for the proper
torque value).
Repeat and for all the
first row panels.