Install Manual
Splice Installation
49
(3) End Splice and the First Row Panel Installation
① Place the PV panel on the U-D
Splice.
② Make any adjustment then
tighten the Head cap screw
M10 to 142 in-lbs (16 N・m)
or 159 in-lbs (18N・m) torque
(see appendix for the proper
torque value).
③ Repeat ① and ② for all the
first row panels.