Install Manual

LANDSCAPE
PANEL INSTALLATION
28
Stretch a string line tight along
the Y1 line between the first
and last brackets in the first
row.
Align all the Pillars on the row,
using the string line as a guide.
Tighten Head cap M8x9, on
bottom side of Pillar to 106 in-
lbs (12 Nm) torque.
Align the Pillars on the eaves side
Maximum Torque value for the head cap M8x9 is 106 in-lbs
(12 N
m).
Attention
!