Specifications
Part No 4801-5156 Rev 10-2014 RollSeal SC-325 & SC-650 Controllers Page 27
10.6 Power Connection with Disconnect
1. Mount Disconnect in desired
location.
2. Connect harness from
Disconnect to Control with
CPC. Push and turn to lock in
place.
3. Remove Disconnect cover.
Switch must be in off position to
remove cover.
4. Connect conduit and electrical
supply to Disconnect.
5. Connect 120V power supply to
Disconnect as shown in
Diagram.
6. Place cover back on Disconnect.
7. Add conduit straps to conduit
10.7 Preparation for Operation
Refer of the RollSeal SC-325 Controller Manual for more information on Controller Settings.
Note: If you detect any problems, STOP. Disconnect electrical power. Contact your
distributor for assistance.
1. Insert fuse in Control.
2. Apply 120VAC power to Control and turn Control toggle switch on.
3. Press “Open” button on Outside Switch. Door should open all the way to home limit switch and
reverse a few inches.
4. Depending on setup, door will time out and automatically close if safety beams are clear. If not setup
to automatically close, press “Close” button on Outside Switch and door should close.
Note: If door doesn’t close completely, follow limit setup procedure in SC325
Controller Manual 4801-5156.
5. Press “Open” a couple times to insure proper operation.
6. Repeat steps 3, 4 and 5 for Inside Switch.
7. Verify Safety Beams reverse door when blocked during closing.
8. Verify Leading Edge Switch is operational.
9. Ensure Safety Pull Hook for Egress is mounted inside cooler and Manual Crank Handle for motor is
mounted outside.
The door is now ready for operation.
120VAC 10A
Ground
L1 - Hot
L2 – Neutral
CPC
Control
Disconnect










