User Manual
34
Periodic Maintenance
4. Maintenance
Spindle Run-in (Warm-up)
Spindle run-in (warm-up) may be required to stabilize the rotation of the spindle.
Situations Requiring This Work
When installing the machine
When replacing the spindle unit
When the machine has not been used for a prolonged period
Before use on days when the ambient temperature is low
Procedure
A
Close the front cover and the dust box cover.
B
Switch on the power.
C
Display VPanel.
" P. 7 "Displaying VPanel"
D
Click , the [Maintenance] tab, and then click [Spindle...].
The VPanel "Spindle maintenance" dialog box appears.
E
Click [Start] next to "Run-in."
F
When the window shown in the following gure appears, click [OK].
Run-in will begin. (It takes approximately 40 minutes.)
G
When the window shown in the following gure appears, click [OK].