Switch User Manual
Table Of Contents
- 1783-UM002C-EN-E, Stratix 8000 Ethernet Managed Switches Hardware User Manual
- Preface
- Table of Contents
- 1 - Start
- 2 - Install the Switch
- Installation Guidelines
- Before You Begin
- Verify Package Contents
- Add Modules to the Switch
- Install the Switch
- Install or Remove the CompactFlash Card
- Set Up the Switch Initially with Express Setup
- Configure and Manage the Switch
- Reset the Switch to Factory Defaults
- Connect to the Switch Ports
- Verify Port Connectivity
- Verify Switch Operation
- Connect a Computer or a Terminal to the Console Port
- Run a Power-on Self-test (POST)
- Verify POST Results
- Disconnect Power
- Install and Remove SFP Modules
- Connect to SFP Modules
- 3 - Troubleshoot the Switch
- 4 - Cable and Connectors
- Index
- Back Cover

60 Publication 1783-UM002C-EN-P - April 2009
Chapter 2
Connect to SFP Fiber Ports
Follow this procedure if you have installed an optional SFP module.
1. Insert a fiber optic cable with an LC connector into the SFP module
(installed in the SFP fiber port).
2. Insert the other cable end into the other device.
ATTENTION
Class 1 laser product. Laser radiation is present when the
system is open and interlocks bypassed. Only trained and
qualified personnel should be allowed to install, replace, or
service this equipment.
TIP
For detailed instructions on installing, removing, and
connecting to SFP modules, see the documentation that
shipped with the SFP module.
VRTA A
31796-M