Switch User Manual
Table Of Contents
- 1783-UM002C-EN-E, Stratix 8000 Ethernet Managed Switches Hardware User Manual
- Preface
- Table of Contents
- 1 - Start
- 2 - Install the Switch
- Installation Guidelines
- Before You Begin
- Verify Package Contents
- Add Modules to the Switch
- Install the Switch
- Install or Remove the CompactFlash Card
- Set Up the Switch Initially with Express Setup
- Configure and Manage the Switch
- Reset the Switch to Factory Defaults
- Connect to the Switch Ports
- Verify Port Connectivity
- Verify Switch Operation
- Connect a Computer or a Terminal to the Console Port
- Run a Power-on Self-test (POST)
- Verify POST Results
- Disconnect Power
- Install and Remove SFP Modules
- Connect to SFP Modules
- 3 - Troubleshoot the Switch
- 4 - Cable and Connectors
- Index
- Back Cover

Publication 1783-UM002C-EN-P - April 2009 43
Chapter 2
3. If a second power source is required (for redundancy), insert a second
power and relay connector into the Pwr B receptacle on the switch front
panel
.
4. Use a screwdriver to tighten the captive screws on the sides of the
second power and relay connector.
ATTENTION
If multiple power sources are used, do not exceed the specified
isolation voltage.
VRTAA
31788-M
VRTA A