Manual
Table Of Contents
- 1. Description
- 2. System Requirements
- 3. OPC Requirements
- 4. Valve Manager Application
- 4.1. Installation
- 4.2. Running the Valve Manager application
- 4.3. Creating a Data Source
- 4.4. Creating a Project
- 4.5. Working with Multiple Projects
- 4.6. Editing a Project
- 4.7. Removing a Project
- 4.8. Adding, Removing, and Renaming Valves
- 4.9. Configuring a Valve Profile
- 4.10. Applying the Same Profile to Multiple Valves
- 4.11. Initiating a Test
- 4.12. Recording Automated Tests and External Events
- 4.13. Clearing Valve Test History
- 4.14. Controlling the Monitor
- 4.15. Project Tree
- 4.16. Main Window

Trusted
TM
Valve Manager T8031
Issue 2 Oct 05 PD-T8031 44
4.16. Main Window
The main window displays detail information based on the current selection in the “Project Tree” view.
When a project is selected, only the “Project” view will be displayed. When a valve is selected, the
“Project”, “Last Test”, “Profile”, and “History Table” views can be displayed. The contents on the main
w
indow can be changed by simply clicking on the appropriate tab for the desired view.
4.16.1. Project View
The Project view displays information about the selected project. The view includes the current status
of the OPC controller, information about the data source and corresponding table names, as well as
any text entered in the “Project Notes” field.
The view also contains a summary of the last test performed for each of the project’s valves.
Figure 46 Valve Test Summary